
RELATED BUILDING COSTS
WHAT ARE THE REAL COSTS TO BUILD YOUR HOME OF CHOICE IN THE LOCATION OF YOUR CHOICE?
Because of the many variables affecting the final costs of construction, we have structured our pricing to reflect the exact contingencies required for a customer's lot.
Your Groff Home will be turn-key with no hidden costs. Customers will only have to pick colors that will make their home custom to fit their unique preferences.
Below you will find very close approximate costs of the above variables. Please note we have a $5,000 fill and clearing allowance built into the turn-key price. By adding the appropriate costs below (by matching your lot's criteria) to the turn-key price of your selected floor plan, a true cost analysis can be formulated.
POPULAR CAPE CORAL
IF YOU CHOOSE A CITY-WATER/CITY-SEWER LOT LOCATION:
Water and Sewer Impact Fees: $7,060.00
Residential Impact Fees and Stormwater: $6,632.00
Building Permit: $1,774.00
______________________________________
$15,466.00 Total
Please Note: Assessment Fee is not included. The Assessment Fee is a variable amount that is based on the lot location. This fee may or may not have been paid by the previous owner. Please check on the status by contacting Cape Coral Utilities.
IF YOU CHOOSE A WELL & SEPTIC LOT LOCATION:
Typical Septic System Cost: $7,500.00
Residential Impact Fees and Stormwater: $6,632.00
Building Permit: $1,774.00
Typical 100' Well, Pumps, Tank, Treatment Package: $5,000.00
______________________________________
$20,906.00 Total
Please NOTE: There is a good possibility that more fill dirt will be needed to reach required house elevation as dictated by the health department. The exact amount required above the base $5,000 fill dirt and clearing allowance will be determined after examination of the lot.
DESIRABLE FORT MYERS/LEHIGH ACRES
IF YOU CHOOSE A CITY-WATER/CITY-SEWER LOT LOCATION:
Water and Sewer Impact Fees: To Be Determined By Lot Location
Building Permit: $3,500.00
IF YOU CHOOSE A WELL & SEPTIC LOT LOCATION:
Typical Septic System Cost: $7,500.00
Building Permit, Residential Impact Fees and Stormwater: $3,500.00
Typical 100' Well, Pumps, Tank, Treatment Package: $5,000.00
______________________________________
$16,000.00 Total
Please NOTE: There is a good possibility that more fill dirt will be needed to reach required house elevation as dictated by the health department. The exact amount required above the base $5,000 fill dirt and clearing allowance will be determined after examination of the lot.